Dual completion GAS-SRP

Dual completion GAS-SRP

Dual completion GAS-SRP equipment is used for simultaneous dual oil and gas production from two formations according to scheme: bottom – gas, top – SRP.

Application

Dual completion of gas and oil through two parallel production strings.

Advantages

  • Separate metering of produced fluid and gas;
  • Separate production mode adjustment for each formation;
  • Methanol to gas production lift feeding;

Benefits

  • Dual completion of oil and gas from single well;
  • Decreased drilling footage;
  • SRP replacement without packer unset and gas lift rising;
  • Double-lift wellhead allowing to explore one formation without stopping another;
  • Killing of each formation without packer unset;
  • (De-) installation with standard equipment and tools by workover crews;
  • Double-lift arrangement for production from one formation when another is stopped;
  • Technological service provided by manufacturer: selection, production, installation, supervision and maintenance;
  • Package supply of subsurface and surface equipment;

Order reference

DUAL COMPLETION GAS-SRP

Technical specification

  • Casing ID, inch (mm):
  • not less than 6 5/8 (168)
  • Tubing OD, inch (mm):
  • from 2 3/8 (60)
  • SRP max. setting depth, ft (m):
  • up to 9850 (3000)
  • SRP estimated flow rate, bopd (m3 /d):
  • up to 345 (55)
  • Max. gas flow rate, m3 /d:
  • up to 100.000

    Ask question or leave an inquiry


    Clicking on the button “Send”, I agree with the terms of the Privacy Policy