Dual completion SRP-ESP

Dual completion SRP-ESP

Dual completion SRP-ESP equipment is used for simultaneous dual oil production from two formations according to scheme: bottom – SRP, top – ESP.

Application

Simultaneous dual oil production from two formations and separate flow rate metering.

Advantages

  • Separate metering of produced fluid;
  • Separate adjustment of each pump;
  • Smaller system dimensions due to concentric arrangement of production strings;
  • Separate sampling from each formation without well stop;

Benefits

  • Increased oil production by eliminating formations interaction;
  • Decreased drilling footage;
  • Decreased well start-up time;
  • Killing of each formation without packer unset;
  • (De-) installation with standard equipment and tools by workover crews;
  • Separate drives for each pump to operate in case the other one is idle;
  • SRP replacement without tubing string rising and packer unset;
  • ESP replacement without packer unset;
  • Technological service provided by manufacturer: selection, production, installation, supervision and maintenance;

Order reference

DUAL COMPLETION SRP-ESP

Technical specification

  • Casing ID, inch (mm):
  • not less than 5 (127)
  • Tubing OD, inch (mm):
  • from 2 7/8 (73)
  • SRP max. setting depth, ft (m):
  • up to 5905 (1800)
  • SRP estimated flow rate, bopd (m3 /d):
  • up to 345 (55)
  • ESP max. setting depth, ft (m):
  • up to 11480 (3500)
  • ESP estimated flow rate, bopd (m3 /d):
  • up to 2200 (350)

    Ask question or leave an inquiry


    Clicking on the button “Send”, I agree with the terms of the Privacy Policy